Robert-Blum-School, Frankfurt am Main

  • task:
  • expansion of an elementary school to a supervised day-care school in Frankfurt am Main - Höchst
  • client:
  • local education authority Frankfurt am Main
  • procedure type:
  • negotiation procedure 2016
  • size:
  • 2.400 sqm
  • status:
  • currently in planning
  • technical planner:
  • ITA Ingenieurgesellschaft für Technische Akustik mbH (acoustics/ thermal building physics) | baucontrol (building site) | Buchart-Horn GmbH (electrical engineering) | CSZ Ingenieurconsult (fire protection) | Ingenieurbüro Brunnenkant (kitchen planning) | IPACH Landschaftsarchitekt BDLA (landscape planning) | S&J Engineering GmbH (TGA) | Dr. Kreutz und Partner (structural engineering) |
  • team:
  • Niklas Storch, Alexander Grams
  • With plans to expand the Robert Blum Elementary School to include after-school supervised activities, additional facilities will be required. The original school at this site dates to the late 19th or early 20th century. In 2004 a two-story u-shaped building was added.

    The design for the new construction is a 1,500 m², three-story, u-shaped addition to the 2004 building which creates an enclosed courtyard. The school’s general education and administrative areas will be enlarged, and a new library, cafeteria, multi-purpose room, and seven after school rooms will accommodate the after school activities.